✍ Sign the Petition Come to CB3 tonight
Left: NYC Parks proposal, illustrative surface study. Right: community concept, preliminary. Permeability figure from the NYC Parks presentation, Nov 12, 2026.
This is the community’s reading of the proposal, which is exactly why we ask NYC Parks to publish the full drawings and materials. See the proposed design in photos.
You’ve just seen the difference. Same playground, two very different futures:
Your signature asks Mayor Mamdani, NYC Parks and Community Board 3 to:
Petition by Friends of Nathan Straus Park & Playground, sponsored by More Gardens! Fund.
If the community doesn’t show up, the Board votes on Parks’ design tonight. Stand with neighbors and P.S. 140 families and ask the Board to postpone the vote until the community plan is part of the design.
Neighbors, families, educators, coaches and local groups who will help build and care for a greener, cooler park. Tell us how you want to help.
Volunteer time and stewardship visits · cleanup crews · repairs and tools · events (puppet shows, movie nights, tournaments, school programs) · funding or materials · sponsorship from local businesses · partner organizations · coming to CB3 to speak.
Join the sign-upAfter a year of community co-design, NYC Parks is advancing a conventional design our neighborhood did not ask for. After digging up asphalt and concrete that covered about 98% of the site, the proposal brings most of it back.
Our ask: Parks should meet Principal Sam and the community, integrate this plan, and bring it back to CB3, with the drawings and materials made public. See the proposed design.
For over a year neighbors, PS140 educators and partners have built this plan together.
Extensive indigenous shade groves and pollinator gardens to cool the block.
A nature-based stream and stormwater features with permeable surfaces.
A year-round geodesic greenhouse-dome lab for students, with on-the-ground growing beds, a stream, and a pond.
Natural stone seating that buffers noise for neighbors and hosts movies, theater and family gatherings.
A fully restored, permeable, NBA-approved, youth-size (85 ft) basketball court for the LES Basketball Youth League, plus a smaller permeable soccer/multi-use field (converts to volleyball, basketball, pickleball) for our soccer-loving students.
Stewardship from neighbors, PS140, the LES Basketball Youth League, More Gardens! Fund, Children’s Magical Garden and apprentices from The Door.
Our line-item estimate for the community plan is $4,118,474 in construction costs. The city’s allocation of about $7.5M also covers design and management, so we ask NYC Parks to publish its breakdown.
Everything in one place.
The full community renovation plan, zone by zone.
A transparent, line-by-line construction estimate.
Share the flyer with families, stewards, and neighbors.
Our co-design history & partnership brief.
Add your name: halt the asphalt-heavy design and build the community plan.