Tonight 6:30 PM · CB3 votes on Nathan Straus. Come help postpone the vote. Sign the petition Tonight’s details
Friends of Nathan Straus Park & Playground
More Gardens! Fund — Member
TONIGHT · CB3 VOTE · 6:30 PM

Pause the Design. Listen to the Community. Build a Better Playground.

Side-by-side comparison of the NYC Parks asphalt proposal and the community's nature-based concept for Nathan Straus Playground.

Left: NYC Parks proposal, illustrative surface study. Right: community concept, preliminary. Permeability figure from the NYC Parks presentation, Nov 12, 2026.

What we asked for, and what the proposal does

✓ Community asked for
✗ Current proposal
Ground
Permeable, nature-based and engineered-wood surfaces, an undulating landscape with granite slides and a stream.
About 88% returns as asphalt and concrete under colorful plastic coating, a gain of less than 11% permeable green space.
Play sets
Natural, cooling play that is gentle on children’s growing bodies.
Plastic-covered metal play sets.
Learning
A Nature Lab with a year-round geodesic greenhouse, growing beds, a stream and pond, plus a storage shed, requested by Principal Rodriguez and PS140.
A fitness training set no one asked for, and no Nature Lab.
Basketball
Full 85-ft courts and a stone amphitheater, backed by the LES Youth Basketball League, 15 years serving local youth.
Court shrunk to 74 ft, squeezed into the old handball corner with a track around it, largely pushing out the League.
Soccer
A multi-use soccer and basketball area with porous interlocking tiles, for our international students.
A volleyball field no one asked for, placed where soccer was planned.
Care
Friends of Nathan Straus, newly formed and ready to help maintain the park.
Parks cites limited maintenance staff.

This is the community’s reading of the proposal, which is exactly why we ask NYC Parks to publish the full drawings and materials. See the proposed design in photos.

SIGN THE PETITION

Halt the asphalt-heavy design. Build the plan our kids deserve.

You’ve just seen the difference. Same playground, two very different futures:

~12% porousNYC Parks’ $7.5M design
90%+ porousCommunity plan, about $4.08M

Your signature asks Mayor Mamdani, NYC Parks and Community Board 3 to:

  • Halt the asphalt-heavy design, not the playground.
  • Bring Parks’ designers back to work with P.S. 140 and neighbors.
  • Build the community plan: porous courts and a soccer field, natural play, a stream, a greenhouse nature lab, an amphitheater and shade trees.

Petition by Friends of Nathan Straus Park & Playground, sponsored by More Gardens! Fund.

Come to Community Board 3 tonight. Help postpone this vote.

If the community doesn’t show up, the Board votes on Parks’ design tonight. Stand with neighbors and P.S. 140 families and ask the Board to postpone the vote until the community plan is part of the design.

3:30 PM · Community discussionAt the playground, 141 Attorney Street
6:30 PM · CB3 Full Board MeetingP.S. 20, 166 Essex Street (E Houston & Stanton Sts)

Join Friends of Nathan Straus Park & Playground

Neighbors, families, educators, coaches and local groups who will help build and care for a greener, cooler park. Tell us how you want to help.

QR code to join the Friends of Nathan Straus Signal group

Join the Friends Signal chat

Scan with your phone camera, or tap the button.

Open the Signal group

Sign up to help, or to bring your organization

Volunteer time and stewardship visits · cleanup crews · repairs and tools · events (puppet shows, movie nights, tournaments, school programs) · funding or materials · sponsorship from local businesses · partner organizations · coming to CB3 to speak.

Join the sign-up

The problem

A rushed proposal, with the community left out

After a year of community co-design, NYC Parks is advancing a conventional design our neighborhood did not ask for. After digging up asphalt and concrete that covered about 98% of the site, the proposal brings most of it back.

Aerial view of Nathan Straus Playground as it exists today, almost entirely asphalt and concrete.
Nathan Straus Playground today.

Our ask: Parks should meet Principal Sam and the community, integrate this plan, and bring it back to CB3, with the drawings and materials made public. See the proposed design.

A cooler, greener, community-built playground is possible

For over a year neighbors, PS140 educators and partners have built this plan together.

Aerial rendering of the community's nature-based concept for Nathan Straus Playground, showing the amphitheater, courts, soccer field and green areas.
A preliminary rendering of the community’s plan.

Shade and cooling

Extensive indigenous shade groves and pollinator gardens to cool the block.

Rendering of natural play elements with a stream, including a turtle-shaped play structure.

Living water

A nature-based stream and stormwater features with permeable surfaces.

Rendering of the PS140 Nature Lab, a geodesic greenhouse dome surrounded by growing beds.

Nature lab for PS140

A year-round geodesic greenhouse-dome lab for students, with on-the-ground growing beds, a stream, and a pond.

Aerial rendering of the stone amphitheater next to the basketball courts.

Stone amphitheater

Natural stone seating that buffers noise for neighbors and hosts movies, theater and family gatherings.

Rendering of children playing on the new multi-use soccer field.

Courts and soccer

A fully restored, permeable, NBA-approved, youth-size (85 ft) basketball court for the LES Basketball Youth League, plus a smaller permeable soccer/multi-use field (converts to volleyball, basketball, pickleball) for our soccer-loving students.

Care for decades

Stewardship from neighbors, PS140, the LES Basketball Youth League, More Gardens! Fund, Children’s Magical Garden and apprentices from The Door.

Labeled zone diagram showing the natural amphitheater, multi-use game area, courts, running track, and shaded picnic benches.
Preliminary zone diagram: courts, running track, and shaded picnic areas.

Our line-item estimate for the community plan is $4,118,474 in construction costs. The city’s allocation of about $7.5M also covers design and management, so we ask NYC Parks to publish its breakdown.

See the plan & take action

Everything in one place.

The Nature Plan →

The full community renovation plan, zone by zone.

The Estimated Budget →

A transparent, line-by-line construction estimate.

The Community Invitation →

Share the flyer with families, stewards, and neighbors.

Community Co-Design Brief →

Our co-design history & partnership brief.

Sign the Petition →

Add your name: halt the asphalt-heavy design and build the community plan.

Sources & further reading

Share this with the people you love.

Every neighbor who shows up, and every friend who shares, makes our collective call louder. Let’s do this!